Clover Power Station Upgrade
Upgrading Legacy Generation From 13.3MVA to 22MVA

The Clover Hydro Power Station Modernisation Project represents a full transformation of a legacy 1945 hydro-electric asset into a modern, digitally controlled renewable generation facility.

Electrical Design & Construction (EDC) was engaged to deliver the complete electrical design, engineering, electrical installation, control, and protection system, enabling a 66% increase in generating capacity while ensuring compliance with modern grid and performance standards.

The project was delivered within a live operational hydro environment, requiring staged implementation, complex system integration, and meticulous commissioning to ensure zero disruption to ongoing generation.